CCAMLR-2000 Synoptic Survey Post-cruise analysis 

CCAMLR-2000 Special Issue Workshop - Appendix D

Map projections for CCAMLR-2000 survey

Lambert Conformal Conic projection

Projection    LAMBERT
Zunits        NO
Units         METERS
Spheroid      WGS84
Xshift        0.0000000000
Yshift        0.0000000000
Parameters
-54 30      0 /* 1st standard parallel
-59 30      0 /* 2nd standard parallel
-40  0      0 /* central meridian
-62  0      0 /* latitude of projection's origin
0.00000 /* false easting (meters)
0.00000 /* false northing (meters)

A recent message from Phil Trathan has suggested that the freeware product PROJ.4 - (available at ftp://kai.er.usgs.gov/pub/Proj.4/ ) can be successfully used to convert files to the Lambert projection. The results using this package have been identical to those from Arc/Info. There is a unix version and a DOS version of PROJ.4, both are likely to be fairly clunky, but both are free.


Any questions then please contact a member of the Steering Committee
 
Dr Jon Watkins (Chairman)
j.watkins@bas.ac.uk
Dr Roger Hewitt
rhewitt@ucsd.edu
Dr Mikio Naganobu
naganobu@enyo.affrc.go.jp
Dr Viacheslav Sushin
sushin@atlant.baltnet.ru
Dr Steve Nicol
Introduction
Reports and meetings
Time table
Guide to authors
Current status of submitted papers
Contents
return to CCAMLR Synoptic survey home page

Page last updated on 26 September 2001