May 28-29th 1996, PACEMAP Data
These plots show the full scan data obtained by the Halley SuperDARN radar. The time resolution for this case study is reduced somewhat to 3 minutes because the radar was also making high time resolution (10sec) measurements on the meridional beam (beam 8). The data are plotted in a geomagnetic projection.