HTTP/1.1 200 OK Date: Sat, 22 Nov 2014 16:22:10 GMT Server: Apache/1.3.31 (Unix) mod_auth_tkt/1.3.11 PHP/4.3.8 mod_ssl/2.8.19 OpenSSL/0.9.7d mod_perl/1.29 X-Powered-By: PHP/4.3.8 Set-Cookie: cookieConsent=X; path=/ Connection: close Content-Type: text/html EIAs for proposed activities in Antarctica prepared by the UK - British Antarctic Survey

Our site is using cookies to record anonymous visitor statistics and enhance your user experience. OK  |  Find out more

Skip navigation

About Antarctica - Dramatic clouds above Reptile Ridge, Adelaide Island

About Antarctica

EIAs for proposed activities in Antarctica prepared by the UK

Home » About Antarctica » Environmental Protection » Environmental Policy and Management » Environmental Impact Assessments (EIAs) in Antarctica » EIAs for proposed activities in Antarctica prepared by the UK »

Final Comprehensive Environmental Evaluations

Lake Ellsworth Consortium (2012)


Subglacial Lake Ellsworth CEE

Lake Ellsworth Consortium (2012)

Final Comprehensive Environmental Evaluation for the Proposed Exploration of Lake Ellsworth, Antarctica.

Shears, J.R., Downie, R.H. and Pasteur, E. (2007). Proposed Construction and Operation of Halley VI Research Station and Demolition and Removal of Halley V Research Station, Brunt Ice Shelf, Antarctica: Final Comprehensive Environmental Evaluation.

Bonner, W.N., R.I. Lewis-Smith and D.W.H. Walton (1989). Final Comprehensive Evaluation for the proposed construction of an airstrip at Rothera Point, Antarctica.

Draft Comprehensive Environmental Evaluations


Subglacial Lake Ellsworth CEE

Lake Ellsworth Consortium (2011)

Draft Comprehensive Environmental Evaluation for the Proposed Exploration of Lake Ellsworth, Antarctica.

Initial Environmental Evaluations

Fothergill, C., Smith, A., and Clarke, R.J. (2013). Initial Environmental Evaluation for the iSTAR: Ice Sheet Stability Research Programme .

Clarke, R.J., Mulvaney, R., (2011). Initial Environmental Evaluation for the Proposed Deep Ice Core Drilling Project on Fletcher Promontory, Antarctica .

Clarke, R.J, Smith, A., (2011). Initial Environmental Evaluation for the Proposed iSTAR: Ice Sheet Stability Research Programme .

Downie, R.H., Ingham, D., Hughes, K. and Fretwell, P. (2005). Initial Environmental Evaluation: Proposed Redevelopment of Rothera Research Station, Rothera Point, Adelaide Island, Antarctica .

Downie, R.H., R. Mulvaney and J.R. Shears (2001). Initial Environmental Evaluation for a proposed deep ice core drilling project on Berkner Island .

Downie, R.H. and J.R. Shears (2000). Initial Environmental Evaluation for the proposed construction and operation of a clean air sector laboratory (CASlab) at Halley Research Station, Antarctica .

Shears, J.R. and R.H. Downie (1999). Initial Environmental Evaluation for the proposed construction of an accommodation building and operations tower at Rothera Research Station, Rothera Point, Adelaide Island, Antarctica .

Shears, J.R., M.J. Jarvis and F-J. Lübken (1997). Initial Environmental Evaluation (IEE) for the proposed use of mesospheric micro-rockets during the 1997/98 austral summer at Rothera Research Station, Adelaide Island, Antarctica .

Jarvis, M.J. and J.R. Shears (1996). Initial Environmental Evaluation for the Medium Frequency Spaced Antenna Radar at Rothera Research Station, Rothera Point, Adelaide Island, Antarctica .

Shears, J.R. (1995). Initial Environmental Evaluation for the redevelopment of Signy Research Station, Signy Island, South Orkney Islands, Antarctica .

Shears, J.R. (1995). Initial Environmental Evaluation for the expansion of Rothera Research Station, Rothera Point, Adelaide Island, Antarctica

Poles Apart (1990). Initial Environmental Evaluation for the rebuilding of the research station, Signy Island, South Orkney Islands, Antarctica .

Back to Top Email to a Friend

© NERC-BAS 2014

Change Text Only Settings

Graphic version of this page